DUONG THANH WATER AND CONSTRUCTION., JSC
Do not say the reason, say the result
Water supply Phu Ninh, capacity: 300.000 m3/day
- Capacity: 300.000m3/day
- Total investment cost: 3.200 Billion VNĐ
- Source of investment: Private capital
- Responsibilities of consultant: Preparing Pre-Feasibility Study,
- Developing Design-Build Drawing
Water supply SONG DA phase2 DN1800
- Capacity: 900.000m3/day
- Diameter: DN1800-DI
- Total investment cost: 1.050 billion VNĐ
- Source of investment: Vinaconex and credit
- Responsibilities of consultant: Developing Design-Build Drawing
Prepare feasibility study report, investment project to build Xuan Mai water supply system
- Responsibilities of consultant: Investigation, Construction supervision, Developing Design-Build Drawing
Sinking the DN1600-transmission pipeline across the Duong River
- Capacity: 35.000m3/day
- Total investment cost: 106 billion VNĐ
- Source of investment: Private capital
- Responsibilities of consultant: Preparing Feasibility Study, Developing
- Design-Build Drawing
Medium urban development project in Vietnam (MCDP) – Phu Ly city subproject, Ha Nam province
- Consultancy on survey, preparation of feasibility study report, basic design, environmental impact assessment report, resettlement plan and other supporting reports for items added to the subdivision. Phu Ly city project
Construction project of water supply system in Nghi Son Capacity:90.000m3/day
- Clean water, capacity: 60.000m3/day
- Raw water, capacity: 90.000m3/day
- Pipeline: DN1200, DN1000, DN800
- Total investment cost: 50 million USD
- Source of investment: BOO
- Responsibilities of consultant: Investigation, Construction supervision,
- Developing Design-Build Drawing
Construction design for construction items of Xuan Mai water plant, phase 1A, capacity 150,000 m3/ngđ
- Capacity: 1A divergence, 150,000 m3/day
Construction design for construction items of Xuan Mai water plant, phase 1A, capacity 150,000 m3/ngđ
- Capacity: 1A divergence, 150,000 m3/day
Construction design for construction items of Xuan Mai water plant, phase 1A, capacity 150,000 m3/ngđ
- Capacity: 1A divergence, 150,000 m3/day
Construction design for construction items of Xuan Mai water plant, phase 1A, capacity 150,000 m3/ngđ
- Capacity: 1A divergence, 150,000 m3/day